KIA Niro: Service Highlight

READ NEXT:

 High voltage battery system inspection guide

Warning Be sure to read and follow the "General Safety Information and Caution" before doing any work related with the high voltage system. Failure to follow the safety instructions may result in serious electrical injuries. B

 Main Fuse Inspection | Checking for Welding in the High Voltage Main Relay

Turn the ignition switch OFF and disconnect the auxiliary 12V battery negative (-) terminal. Shut off the high voltage. (Refer to Hybrid Control System - "High voltage Shut-off Procedures") Remove the center tra

SEE MORE:

 Electrical Circuit Inspection Procedure

Check Open Circuit Procedures for Open Circuit Continuity Check Voltage Check If an open circuit occurs (as seen in (FIG. 1)), it can be found by performing Step 2 (Continuity Check Method) or Step 3 (Voltage Check Method) as s

 Service Point Target Auto Calibration (SPTAC) Procedure

Install the SST (09964-C1200) on the roof center above the vehicle's front windshield. Have the laser illuminate starting from the roof center and to passing through the emblem center. Warning The level laser must be se

Categories